Files
solelog/docs/sessions/2026-06-17-phase-0-kickoff.md

4.7 KiB
Raw Blame History

Session: 2026-06-17 — Reverse-engineer, plan, kick off Phase 0

Goal

Take an inherited Create/Anything export of an insole-production time tracker, understand it, decide a direction, and start building toward a self-owned version.

Work done

  1. Git repo created. Initialised, baseline commit of the code "as received".
  2. Reverse-engineering. Established it is a two-app monorepo: apps/mobile (Expo) + apps/web (Next.js backend on Neon Postgres) + publisher/. Found it heavily coupled to the Create platform; the live data/accounts are held in the platform's DB (owned by the friend's Create account), not by us.
  3. Fixes committed. Corrected CLAUDE.md; found & repaired /api/logs (git-ignored by an over-broad logs rule and missing its import sql); added a reverse-engineered apps/web/db/schema.sql; reconciled yarn.lock with package.json; installed deps.
  4. Brainstormed the target (superpowers:brainstorming) and wrote docs/roadmap.md — vision + 8 decisions + architecture + 6-phase roadmap.
  5. Wrote docs/plans/phase-0-foundation.md (superpowers:writing-plans) — a TDD plan for the dockerized backend.
  6. Repo hygiene: .gitattributes (LF normalization); gitignored .mcp.json and CLAUDE.local.md.

Key decisions (full detail in docs/roadmap.md)

  • Purpose: real workshop tool and learning vehicle.
  • Clean break from the Create platform; greenfield rebuild porting the good parts.
  • Dedicated backend service (Option A) owns auth + DB; mobile and admin are clients.
  • Stack: Hono + better-auth + Drizzle + SQLite (libsql), TypeScript everywhere, dockerized (local now, any cloud later). Project name: SoleLog (@solelog/*).

Current state

  • Working tree clean; planning docs tracked under docs/.
  • Phase 0 plan ready; implementation kicked off via a multi-agent workflow (per-task implement + adversarial verify).
  • Inherited apps/mobile / apps/web remain untouched as reference.

Next steps

  • Complete Phase 0 (tasks 16): dockerized backend + auth round-trip.
  • Then Phase 1 (worker timing flow with server-authoritative sessions).

Update — Plane tracking + workflow resume

  • Plane tickets created (project SoleLog, SL):
    • SL-1 — Phase 0 parent (In Progress).
    • SL-2 — Task 1 (Done; commit f83c9a6, @solelog/shared + packages/* wiring).
    • SL-3SL-7 — Tasks 26 (Task 2 In Progress, rest Todo).
    • Note: Plane epics feature is not enabled on this instance (resolve_work_item_type "Epic" → 404), so Phase 0 is a regular parent work item with child tasks instead of an Epic.
  • Workflow status: the Phase 0 workflow (wf_fb12871c-e87, task whk7sod9p) survived the /compact and is still running in the background — Task 1 committed, Tasks 26 in progress. Resume was unnecessary (and is blocked while the run is live). Letting it run to completion.

Phase 0 — COMPLETE

The workflow finished all 6 tasks (0 fix loops). Independently re-verified: yarn workspace @solelog/api test → 4 files / 5 tests pass, typecheck clean. The Task 6 verifier ran the full live Docker round-trip (docker compose up --build): /health ok, sign-up → sign-in → bearer token → GET /api/me returns the user, no-token → 401, SQLite volume persisted.

Commits: f83c9a6 shared · 62c8597 Hono+/health · e8aa2c6 DB · 89f892c better-auth · 04cfe0f /api/me · bcb305b docker.

Two post-workflow fixes (the only flagged issues, both verified):

  • 41b65f2 — reconciled apps/api/src/db/schema.ts to the authoritative better-auth@1.6.18 CLI output (was timestamp → now timestamp_ms, nullable verification timestamps → notNull, added unixepoch defaults + the session_userId_idx / account_userId_idx / verification_identifier_idx indexes). Rebuilt migration 0000 from scratch (no data exists). Converted index callbacks from the CLI's array form to the object form drizzle-orm@0.36.4 requires. db:generate now reports no pending changes.
  • efff221 — fixed migrate.ts's direct-run guard (pathToFileURL) so yarn db:migrate works on Windows for local dev, not just inside the Linux container.

Plane: SL-1 (Phase 0) + SL-2..SL-7 (Tasks 16) all Done.

Next: Phase 1 — worker timing (server-authoritative work-sessions, history, CSV export; mobile app rebuilt onto the new API). Needs its own spec → plan → build cycle.

Open items to confirm with the friend

  • Whether any live data / worker accounts exist in his Create instance that must be exported before going live on a fresh DB (a greenfield can't recreate it).
  • Real workbench ↔ activity mapping (hardcoded/seeded for now).