docs: add session log for 2026-06-17 Phase 0 kickoff

This commit is contained in:
Bas van Rossem
2026-06-17 13:20:35 +02:00
parent 74e697054a
commit 1d395b417b

View File

@@ -0,0 +1,43 @@
# Session: 2026-06-17 — Reverse-engineer, plan, kick off Phase 0
## Goal
Take an inherited Create/Anything export of an insole-production time tracker, understand
it, decide a direction, and start building toward a self-owned version.
## Work done
1. **Git repo created.** Initialised, baseline commit of the code "as received".
2. **Reverse-engineering.** Established it is a two-app monorepo: `apps/mobile` (Expo) +
`apps/web` (Next.js backend on Neon Postgres) + `publisher/`. Found it heavily coupled
to the Create platform; the live data/accounts are held in the platform's DB (owned by
the friend's Create account), not by us.
3. **Fixes committed.** Corrected `CLAUDE.md`; found & repaired `/api/logs` (git-ignored by
an over-broad `logs` rule **and** missing its `import sql`); added a reverse-engineered
`apps/web/db/schema.sql`; reconciled `yarn.lock` with `package.json`; installed deps.
4. **Brainstormed the target** (superpowers:brainstorming) and wrote
**`docs/roadmap.md`** — vision + 8 decisions + architecture + 6-phase roadmap.
5. **Wrote `docs/plans/phase-0-foundation.md`** (superpowers:writing-plans) — a TDD plan
for the dockerized backend.
6. **Repo hygiene:** `.gitattributes` (LF normalization); gitignored `.mcp.json` and
`CLAUDE.local.md`.
## Key decisions (full detail in docs/roadmap.md)
- Purpose: real workshop tool **and** learning vehicle.
- **Clean break** from the Create platform; **greenfield rebuild** porting the good parts.
- **Dedicated backend service** (Option A) owns auth + DB; mobile and admin are clients.
- Stack: **Hono + better-auth + Drizzle + SQLite (libsql)**, TypeScript everywhere,
**dockerized** (local now, any cloud later). Project name: **SoleLog** (`@solelog/*`).
## Current state
- Working tree clean; planning docs tracked under `docs/`.
- Phase 0 plan ready; implementation kicked off via a multi-agent **workflow**
(per-task implement + adversarial verify).
- Inherited `apps/mobile` / `apps/web` remain untouched as reference.
## Next steps
- Complete Phase 0 (tasks 16): dockerized backend + auth round-trip.
- Then Phase 1 (worker timing flow with server-authoritative sessions).
## Open items to confirm with the friend
- Whether any **live data / worker accounts** exist in his Create instance that must be
exported before going live on a fresh DB (a greenfield can't recreate it).
- Real **workbench ↔ activity** mapping (hardcoded/seeded for now).